Fault level calculator for LT panels

Type the transformer rating and its impedance. The calculator gives the fault level at the panel, the peak current and the short-circuit rating to ask for.

Your figures

How it is worked out

The calculator follows the engineering check of the PanelPro application, which uses the method of IEC 60909 in its simplest safe form.

  1. Full-load current of the source. For a transformer, I = kVA × 1000 ÷ (1.732 × V).
  2. Fault current. The full-load current is divided by the impedance and multiplied by 1.05, the voltage factor of IEC 60909 for low-voltage systems: Ik = 1.05 × I ÷ (%Z ÷ 100). A generator is treated the same way with its sub-transient reactance Xd''.
  3. Sources together. If the transformer and the generator run in parallel, their currents are added. If only one feeds the panel at a time, the larger is taken.
  4. Motors. Running motors add four times their own current.
  5. Peak. The first peak of the fault current is the r.m.s. value multiplied by √2 and by a factor that depends on the X/R ratio of the source.
  6. Panel rating. The lowest standard rating is chosen that covers both the r.m.s. value and the peak. The peak a panel stands is its rating multiplied by the factor n of IEC 61439-1, Table 7.

A worked example

A 1000 kVA transformer with 5 % impedance feeds a 415 V panel.

Full-load current = 1000 × 1000 ÷ (1.732 × 415) = 1391 A
Fault level = 1.05 × 1391 ÷ 0.05 = 29.2 kA
Peak = 29.2 × 1.61 × √2 = 67 kA
Panel rating to ask for = 35 kA, which stands a peak of 35 × 2.1 = 73.5 kA

A 25 kA panel would not do, and a 50 kA panel would be more than this transformer can ever ask of it.

What the sum leaves out

  • The grid. The supply ahead of the transformer is taken as infinitely strong. A real grid lowers the result a little.
  • Cables and bus ducts. Their impedance is left out. A panel at the end of a long cable sees less than the figure shown.

Both make the answer err on the safe side. That is right for an estimate. Where the peak decides the rating, or the figure sits just above a standard rating, a closer sum with the real X/R ratio and the cable lengths often brings it back down. The guide to fault level goes through this, with a table for the common transformer sizes.

Questions people ask

What is the impedance, %Z?

It is the transformer's own impedance, in per cent, printed on its nameplate. A lower figure lets more fault current through. Distribution transformers are usually between 4 and 6.25 per cent.

Do two transformers double the fault level?

Only if they feed the same busbar at the same time. With the bus coupler open, each half of the panel sees one transformer. If the sources can ever run in parallel, rate the panel for the sum.

Why are running motors added?

For the first few cycles of a fault, running motors act as generators and feed current into it. The calculator adds four times their running current, the usual simplified figure.

Can I use this result for a tender?

It is a sound first figure and it is on the safe side. For a large system, or where the rating is close to a limit, ask for a fault study with the real grid data and cable lengths.