29 lessons recorded in the real application, on a made-up job. Each lesson opens with the conventional way, estimating in Excel, drawing in AutoCAD and typing the offer in Word, and then shows the same work in PanelPro, step by step.
FactoryTalk View SE: licences, computers, network and engineering
ReplacesLicence sizes chosen from the price list by hand
Inputs · card 1b · 9 steps
Function by function
The conventional way, and the same job in PanelPro
One row for each lesson. The middle column is the usual practice with Excel, AutoCAD and Word. The right column is what the application does. Click a row to watch it done.
Function
The conventional way
With PanelPro
Watch
Lesson 1The whole job in one windowDashboard
Costing in Excel, typed line by line from the price list
GA, single-line diagram and circuits drawn separately in AutoCAD
Offer typed in Word, numbers copied across by hand
One changed feeder means correcting all three files
One load list drives the price, the drawings and the offer
Tabs follow the job, from Enquiry to Quote
Change a feeder and every number and sheet follows
Automatic checks point to what is still missing
3:46
Lesson 2Read any enquiry or tenderEnquiry
Read the whole tender to find the lines about your panel
Note IP, form, fault level and busbar on paper, then type them in
A value meant for the HT panel or a motor slips into the LT panel
Retype the feeder list into Excel
Open PDF, Excel, Word, e-mail, pictures or ZIP, or paste the text
Each value is shown with the sentence it came from
Values about other equipment are set aside, with the reason
Feeder lists become the load list, only when you apply
3:13
Lesson 3Start from a drawing, a BOM or a few wordsEnquiry
Count feeders off the single-line diagram by hand
Retype a consultant's BOM to price it again
Type every feeder row by row, even for a budget price
A CAD single-line diagram in PDF is read panel by panel
Your own BOM in Excel becomes the load list and the prices
Type or dictate: add 3 pumps 22 kW DOL
Similar past jobs appear beside the new enquiry
3:16
Lesson 4Engineering check and questions for the clientEnquiry
Fault level copied from the enquiry, never checked against the transformer
Conflicting values in the tender found only after the order
Clarification e-mail written from scratch every time
Cheaper alternatives depend on who remembers them
Fault level worked out from the transformer and DG, with motor contribution
Conflicts and gaps listed as findings
Questions for the client ready to copy or e-mail
Alternatives you can offer, with a typical saving range
3:15
Lesson 5Panel selectionsInputs · card 1
Specification spread across the tender, the e-mails and your notes
kA, form and IP remembered while picking every item
A missed clause turns into a deviation after the order
Every choice of the panel in one card
Each value is confirmed by you, none is assumed
Breakers, busbar and enclosure follow these choices
8 switchgear makes and 11 panel types
3:30
Lesson 6Enclosure make and its priceInputs · card 1a
Enclosure priced by a thumb rule per section
Cubicle sizes of each make looked up in catalogues
Own fabrication costed in a separate sheet
13 enclosure systems, or your own fabrication
OEM sections priced from that maker's own price list
Your own formula per section and per panel
Assembly hours counted for OEM systems
2:50
Lesson 7The load listInputs · cards 2a and 2
One Excel row per feeder, with breaker, contactor and relay picked by hand
Motor current looked up in a table for every rating
Type 2 chart opened for every starter
Quantities multiplied by hand
Type kW and starter type: breaker, contactor, overload and cable follow
Import from Excel or CSV, or paste the list
MPCB, MCCB, MCB or switch-fuse per feeder
Quantity and cable length in the same row
3:46
Lesson 8Discounts, rates and marginInputs · cards 6 and 7
Discount typed against every line of the sheet
A copper rate change means editing many cells
Margin formula differs from sheet to sheet
One discount per switchgear group, and per type if you wish
Your own rates in one card: steel, copper, labour, packing
One margin rule on every job
Change a rate and the whole estimate follows
3:07
Lesson 9Busbar sizing and temperature riseDesign · cards 3 and 3d
Busbar size taken from a chart or from habit
Derating for ambient, altitude and IP often skipped
Calculations made in a separate sheet, only when the client insists
Busbar chosen from current density with derating
Cross-section checked for the fault current and its duration
Electrodynamic stress and temperature rise calculated
One tick puts each calculation in the Technical Offer
3:31
Lesson 10GA and IGA drawingsDesign · card 3a
Front view drawn in AutoCAD, module by module
Number of sections found by trial and error
Drawing redone when a feeder is added
Dimensions typed by hand into the offer
Sections, length, depth and height worked out from the load list
GA with elevation and plan, IGA with every module
DXF for AutoCAD, Visio or EPLAN, and SVG
Module sizes are yours to edit, and the drawings follow
3:18
Lesson 11Single-line diagram and control circuitsDesign · card 3c
SLD drawn feeder by feeder in AutoCAD
DOL and star-delta circuits copied from an old job and edited
Feeder schedule typed again inside the drawing
Device lists for EPLAN typed by hand
SLD in the order of the panel, from the same feeders
A typical power and control circuit for every starter type used
Feeder schedule on its own sheet
DXF sheets, and device and parts lists for EPLAN
3:05
Lesson 12Production data for the shop floorDesign · card 3b
Busbar lengths measured off the drawing
Hardware, glands and lugs counted by the storekeeper
Ferrule and label lists typed in Excel
Gland plate marked out on the shop floor
Busbar cut list with supports, bolts and hardware
Cable schedule, glands and lugs by cable size
Gland plate drawings with a hole schedule
Ferrules, labels and ducts in one Excel production pack
3:07
Lesson 13Wire list, test sheet and layout checksDesign · cards 3e and 3f
Wires measured and cut one by one at the panel
No wire list unless the client pays for it
Test sheet written by hand for every panel
An overfilled duct is found while wiring
Every wire: number, from, to, size, colour, cut and strip length
Grouped cut list for the cutting table or a machine
Printable test and inspection sheet
Module gaps, section fill, duct fill and gland plate are checked
3:14
Lesson 14Send to AutoCADDesign · card 3g
Full drawing set drawn sheet by sheet by a draughtsman
Feeder data typed again into schedules and title blocks
Drawings and BOM drift apart after each revision
One export carries feeders, ratings, starters and the BOM
Cover, index, SLD, GA, circuits for every feeder, terminal plan, schedules
Drawings made from the same data as the price
Nothing is sent over the internet
2:11
Lesson 15The cost estimate and the BOMEstimate · cards 4, 4b to 4e
Every item looked up in the price list
Discount and net price worked out line by line
Lugs, ferrules and wiring guessed as a percentage
One wrong cell breaks the total
Feeder-wise BOM with class A, B and C items
List price and discount for every item in one list
Wiring, terminals and hardware counted, not guessed
Labour, packing, transport, contingency and GST shown step by step
3:37
Lesson 16Use your stock, and edit in ExcelEstimate · cards 4a and 4f
Stock checked by phone with the stores
Stock lies unused while new items are bought
Edits made in Excel never reach the drawings or the offer
Stock that fits a line is proposed, never undersized
Download to Excel, change it, upload it back
The app remembers your changes for the next estimate
A team file shares them inside your company
3:16
Lesson 17Technical and commercial offersQuote
Offer typed in Word over the last job's file
Data sheet, BOM and price copied from Excel by hand
An old client name or a wrong total stays in the document
Cover e-mail written again each time
Technical Offer: data sheet, GA, IGA and feeder-wise BOM
Commercial Offer: price, taxes and terms
PDF, Word, Excel and HTML
Cover e-mail drafted from the estimate, with deviations
3:54
Lesson 18Your price lists and selection chartsMaster data · cards 1b to 1f
Price list PDFs searched for every item
Type 2 chart read for every motor
A new price list means pricing old sheets again by hand
Import each maker's price list from Excel or CSV
Class A, B, C and your discount kept with each item
Type 2 chart picks contactor and overload by motor kW
A new list in, and every estimate uses it
4:30
Lesson 19Tally link, and teaching from your own sheetsMaster data
Purchase rates checked in Tally in another window
Stock and last purchase rate unknown while quoting
Your way of estimating lives in one person's Excel
Item master and purchase rates read from Tally, read-only
Stock and last rate beside every line
Shortage and code-mismatch lists
A finished sheet teaches your items, prices and discounts
3:58
Lesson 20Make converterMake converter
Two catalogues open side by side for every line
kA or poles missed in the alternate make
The work repeated for every enquiry
Upload or paste a BOM in one make
Equivalent series and a specification line in the other makes
Catalogue numbers from your item master when the specification matches
Teach it from a BOQ you already converted
3:19
Lesson 21Projects, revisions and learningProjects
Files named final, final 2 and final revised
No record of what changed between revisions
Actual cost never compared with the estimate
Backups depend on one computer
Every save is a revision: R0, R1, R2
Two revisions compared, with what changed
Record actual cost and hours, and the app learns your ratio
Export all jobs, or a password-protected backup
3:48
Lesson 22Intelligent MCCInputs · card 1b
Relays, switches, gateway and 24 V supply listed by hand
Node addresses kept in a separate sheet
Network drawing made apart from the panel drawings
Every DOL and star-delta feeder gets its intelligent relay
Switches, gateway, supply and addresses sized and priced
Network sheet and node list drawn
Works with every switchgear make
2:32
Lesson 23APFC panelInputs · card 1b
kVAr worked out on a calculator
Step sizes chosen by habit
Reactor, capacitor voltage and incomer taken from separate tables
Resonance with the transformer rarely checked
kVAr from the load and the power factors
Steps proposed and written to the load list
Capacitor, reactor, contactor or thyristor for each step
Filter current from the non-linear load and its distortion
Made up of modules, each with its breaker
Sensing CTs and their direction on the connection sheet
Ventilation counted
2:21
Lesson 25Bus duct runsBus duct
Route measured on the layout drawing
Elbows, joints and hangers counted by hand
Priced apart from the panel
Describe the route: up 3; right 12; down 2.5
Elbows, joints and hangers counted
Costed from your own rates
Added to the estimate and the BOM
2:31
Lesson 26PCC, DG synchronising and distribution boardsInputs · cards 1, 2 and 7
A different Excel template for every kind of panel
ACB or MCCB decided feeder by feeder
Bus couplers and synchronising sets added from memory
One load list for every kind of switchboard
Large feeders take ACBs, small ones MCCBs or MCBs, by themselves
Incomers, bus couplers and DG synchronising sets are counted
The panel type prints on the offer and the drawings
3:47
Lesson 27PLC panel on Allen-BradleyInputs · card 1b
Controller and modules picked from the selection guide by hand
Rack limits and power budget checked in a sheet
Relays, fuses and terminals counted per I/O point
Engineering hours guessed
Type the I/O count: controller, modules and racks are chosen
24 V DC supply, relays, fuses and terminals sized
Architecture, module schedule and panel layout drawn
Engineering hours counted, at your own rate
4:21
Lesson 28DCS panel on PlantPAxInputs · card 1b
Redundant chassis, HART modules and ring worked out from several manuals
Servers and workstations counted from the guide
Software licences listed from memory
Redundant process controllers, HART I/O on a device-level ring
PlantPAx servers and workstations sized
Two architecture sheets
A reminder to confirm in Rockwell's PlantPAx System Estimator
3:20
Lesson 29SCADA systemInputs · card 1b
Licence sizes chosen from the price list by hand
Computers, network and UPS remembered only at the order
Engineering hours guessed
Tags, stations, redundancy and historian in; licences out
Computers, network, UPS and furniture listed
Engineering hours from displays and tags, at your rate
Architecture sheet drawn
2:42
The left column describes common practice, not a measurement. What the application works out is an estimating and design aid: check dimensions, wire lengths and hardware counts against your own shop standards and the maker's catalogue before you build.
About these lessons
Recorded in the application itself
Every lesson is a screen recording of version 1.18, driven step by step. Nothing is mocked up. The job, the client, the price lists and the Tally stock in the lessons are made up for the purpose.
Every lesson is narrated in English, and each step also has a caption, so a lesson can be followed with the sound off. Use the steps beside the video to jump to the point you need, and the speed button to go faster.
Next
Try it on your own enquiry
The demo runs for 24 hours from the first start, with every function open. Take a real enquiry and follow lessons 1 and 2.