Coming nextPrakriya: a PLC and SCADA program generator with a batch optimiser.Join the waitlist →
BIRADAR PANELPRO
Tutorials · version 1.18

Every function, and what it replaces

29 lessons recorded in the real application, on a made-up job. Each lesson opens with the conventional way, estimating in Excel, drawing in AutoCAD and typing the offer in Word, and then shows the same work in PanelPro, step by step.

29lessons, every tab and card
1 h 36 minnarrated in English, with captions
410steps you can jump to
9parts, from enquiry to automation
0 of 29 lessons watched
No lesson matches. Try another word, or choose "All".

Start here

4 lessons · 14 min
013:46

The whole job in one window

From the enquiry to the offer and the drawings, without typing anything twice

ReplacesCosting in Excel, typed line by line from the price list
Dashboard · 18 steps
023:13

Read any enquiry or tender

The built-in reader takes what is said about your panel and sets the rest aside

ReplacesRead the whole tender to find the lines about your panel
Enquiry · 14 steps
033:16

Start from a drawing, a BOM or a few words

Single-line diagrams, your own bill of materials and quick add

ReplacesCount feeders off the single-line diagram by hand
Enquiry · 13 steps
043:15

Engineering check and questions for the client

Fault level from the real supply, findings, alternatives and the clarification e-mail

ReplacesFault level copied from the enquiry, never checked against the transformer
Enquiry · 14 steps

Inputs

4 lessons · 13 min
053:30

Panel selections

The whole specification in one card, confirmed by you, never assumed

ReplacesSpecification spread across the tender, the e-mails and your notes
Inputs · card 1 · 14 steps
062:50

Enclosure make and its price

OEM cubicle systems or your own fabrication, costed your way

ReplacesEnclosure priced by a thumb rule per section
Inputs · card 1a · 13 steps
073:46

The load list

Type the motor and its starter. The app selects the rest

ReplacesOne Excel row per feeder, with breaker, contactor and relay picked by hand
Inputs · cards 2a and 2 · 19 steps
083:07

Discounts, rates and margin

Your own costing, entered once and used on every job

ReplacesDiscount typed against every line of the sheet
Inputs · cards 6 and 7 · 12 steps

Design and drawings

6 lessons · 18 min
093:31

Busbar sizing and temperature rise

Sized with derating, checked for the fault, calculated for the offer

ReplacesBusbar size taken from a chart or from habit
Design · cards 3 and 3d · 12 steps
103:18

GA and IGA drawings

Sections, dimensions and both drawings from the load list

ReplacesFront view drawn in AutoCAD, module by module
Design · card 3a · 16 steps
113:05

Single-line diagram and control circuits

SLD, typical power and control circuits and the feeder schedule

ReplacesSLD drawn feeder by feeder in AutoCAD
Design · card 3c · 14 steps
123:07

Production data for the shop floor

Busbar cut list, hardware, cables, glands, ducts, ferrules and labels

ReplacesBusbar lengths measured off the drawing
Design · card 3b · 16 steps
133:14

Wire list, test sheet and layout checks

Every wire with its cut and strip length, and a check of the layout

ReplacesWires measured and cut one by one at the panel
Design · cards 3e and 3f · 14 steps
142:11

Send to AutoCAD

One export for the full electrical drawing set

ReplacesFull drawing set drawn sheet by sheet by a draughtsman
Design · card 3g · 8 steps

Estimate

2 lessons · 7 min
153:37

The cost estimate and the BOM

Feeder-wise bill of materials, every price in one list, the offer price built up in the open

ReplacesEvery item looked up in the price list
Estimate · cards 4, 4b to 4e · 12 steps
163:16

Use your stock, and edit in Excel

Stock that fits is proposed. Changes made in Excel come back

ReplacesStock checked by phone with the stores
Estimate · cards 4a and 4f · 14 steps

Offer

1 lesson · 4 min
173:54

Technical and commercial offers

Two documents, a cover e-mail and every export, from the same estimate

ReplacesOffer typed in Word over the last job's file
Quote · 23 steps

Your prices

3 lessons · 12 min
184:30

Your price lists and selection charts

The item master: your prices, your discounts, your Type 2 chart

ReplacesPrice list PDFs searched for every item
Master data · cards 1b to 1f · 20 steps
193:58

Tally link, and teaching from your own sheets

Purchase rates and stock from Tally. Your habits from your estimation sheet

ReplacesPurchase rates checked in Tally in another window
Master data · 17 steps
203:19

Make converter

Equivalents of a whole BOM in other makes, to ask for alternate quotes

ReplacesTwo catalogues open side by side for every line
Make converter · 15 steps

Projects

1 lesson · 4 min
213:48

Projects, revisions and learning

Every revision kept, compared, and measured against the real job

ReplacesFiles named final, final 2 and final revised
Projects · 16 steps

Special panels

5 lessons · 14 min
222:32

Intelligent MCC

Motor relays and the network, for every switchgear make

ReplacesRelays, switches, gateway and 24 V supply listed by hand
Inputs · card 1b · 11 steps
232:50

APFC panel

kVAr from the power factor, steps, detuned reactors

ReplaceskVAr worked out on a calculator
Inputs · card 1b · 10 steps
242:21

Active harmonic filter panel

Filter current, modules and sensing CTs

ReplacesFilter current taken from a quick guess
Inputs · card 1b · 8 steps
252:31

Bus duct runs

Describe the route in words. Elbows, joints and hangers are counted

ReplacesRoute measured on the layout drawing
Bus duct · 11 steps
263:47

PCC, DG synchronising and distribution boards

The same load list builds every kind of switchboard

ReplacesA different Excel template for every kind of panel
Inputs · cards 1, 2 and 7 · 17 steps

Automation

3 lessons · 10 min
274:21

PLC panel on Allen-Bradley

From the I/O count to controller, modules, panel and price

ReplacesController and modules picked from the selection guide by hand
Inputs · card 1b · 18 steps
283:20

DCS panel on PlantPAx

Redundant process controllers, HART I/O, servers and workstations

ReplacesRedundant chassis, HART modules and ring worked out from several manuals
Inputs · card 1b · 12 steps
292:42

SCADA system

FactoryTalk View SE: licences, computers, network and engineering

ReplacesLicence sizes chosen from the price list by hand
Inputs · card 1b · 9 steps
Function by function

The conventional way, and the same job in PanelPro

One row for each lesson. The middle column is the usual practice with Excel, AutoCAD and Word. The right column is what the application does. Click a row to watch it done.

FunctionThe conventional wayWith PanelProWatch
Lesson 1The whole job in one windowDashboard
  • Costing in Excel, typed line by line from the price list
  • GA, single-line diagram and circuits drawn separately in AutoCAD
  • Offer typed in Word, numbers copied across by hand
  • One changed feeder means correcting all three files
  • One load list drives the price, the drawings and the offer
  • Tabs follow the job, from Enquiry to Quote
  • Change a feeder and every number and sheet follows
  • Automatic checks point to what is still missing
3:46
Lesson 2Read any enquiry or tenderEnquiry
  • Read the whole tender to find the lines about your panel
  • Note IP, form, fault level and busbar on paper, then type them in
  • A value meant for the HT panel or a motor slips into the LT panel
  • Retype the feeder list into Excel
  • Open PDF, Excel, Word, e-mail, pictures or ZIP, or paste the text
  • Each value is shown with the sentence it came from
  • Values about other equipment are set aside, with the reason
  • Feeder lists become the load list, only when you apply
3:13
Lesson 3Start from a drawing, a BOM or a few wordsEnquiry
  • Count feeders off the single-line diagram by hand
  • Retype a consultant's BOM to price it again
  • Type every feeder row by row, even for a budget price
  • A CAD single-line diagram in PDF is read panel by panel
  • Your own BOM in Excel becomes the load list and the prices
  • Type or dictate: add 3 pumps 22 kW DOL
  • Similar past jobs appear beside the new enquiry
3:16
Lesson 4Engineering check and questions for the clientEnquiry
  • Fault level copied from the enquiry, never checked against the transformer
  • Conflicting values in the tender found only after the order
  • Clarification e-mail written from scratch every time
  • Cheaper alternatives depend on who remembers them
  • Fault level worked out from the transformer and DG, with motor contribution
  • Conflicts and gaps listed as findings
  • Questions for the client ready to copy or e-mail
  • Alternatives you can offer, with a typical saving range
3:15
Lesson 5Panel selectionsInputs · card 1
  • Specification spread across the tender, the e-mails and your notes
  • kA, form and IP remembered while picking every item
  • A missed clause turns into a deviation after the order
  • Every choice of the panel in one card
  • Each value is confirmed by you, none is assumed
  • Breakers, busbar and enclosure follow these choices
  • 8 switchgear makes and 11 panel types
3:30
Lesson 6Enclosure make and its priceInputs · card 1a
  • Enclosure priced by a thumb rule per section
  • Cubicle sizes of each make looked up in catalogues
  • Own fabrication costed in a separate sheet
  • 13 enclosure systems, or your own fabrication
  • OEM sections priced from that maker's own price list
  • Your own formula per section and per panel
  • Assembly hours counted for OEM systems
2:50
Lesson 7The load listInputs · cards 2a and 2
  • One Excel row per feeder, with breaker, contactor and relay picked by hand
  • Motor current looked up in a table for every rating
  • Type 2 chart opened for every starter
  • Quantities multiplied by hand
  • Type kW and starter type: breaker, contactor, overload and cable follow
  • Import from Excel or CSV, or paste the list
  • MPCB, MCCB, MCB or switch-fuse per feeder
  • Quantity and cable length in the same row
3:46
Lesson 8Discounts, rates and marginInputs · cards 6 and 7
  • Discount typed against every line of the sheet
  • A copper rate change means editing many cells
  • Margin formula differs from sheet to sheet
  • One discount per switchgear group, and per type if you wish
  • Your own rates in one card: steel, copper, labour, packing
  • One margin rule on every job
  • Change a rate and the whole estimate follows
3:07
Lesson 9Busbar sizing and temperature riseDesign · cards 3 and 3d
  • Busbar size taken from a chart or from habit
  • Derating for ambient, altitude and IP often skipped
  • Calculations made in a separate sheet, only when the client insists
  • Busbar chosen from current density with derating
  • Cross-section checked for the fault current and its duration
  • Electrodynamic stress and temperature rise calculated
  • One tick puts each calculation in the Technical Offer
3:31
Lesson 10GA and IGA drawingsDesign · card 3a
  • Front view drawn in AutoCAD, module by module
  • Number of sections found by trial and error
  • Drawing redone when a feeder is added
  • Dimensions typed by hand into the offer
  • Sections, length, depth and height worked out from the load list
  • GA with elevation and plan, IGA with every module
  • DXF for AutoCAD, Visio or EPLAN, and SVG
  • Module sizes are yours to edit, and the drawings follow
3:18
Lesson 11Single-line diagram and control circuitsDesign · card 3c
  • SLD drawn feeder by feeder in AutoCAD
  • DOL and star-delta circuits copied from an old job and edited
  • Feeder schedule typed again inside the drawing
  • Device lists for EPLAN typed by hand
  • SLD in the order of the panel, from the same feeders
  • A typical power and control circuit for every starter type used
  • Feeder schedule on its own sheet
  • DXF sheets, and device and parts lists for EPLAN
3:05
Lesson 12Production data for the shop floorDesign · card 3b
  • Busbar lengths measured off the drawing
  • Hardware, glands and lugs counted by the storekeeper
  • Ferrule and label lists typed in Excel
  • Gland plate marked out on the shop floor
  • Busbar cut list with supports, bolts and hardware
  • Cable schedule, glands and lugs by cable size
  • Gland plate drawings with a hole schedule
  • Ferrules, labels and ducts in one Excel production pack
3:07
Lesson 13Wire list, test sheet and layout checksDesign · cards 3e and 3f
  • Wires measured and cut one by one at the panel
  • No wire list unless the client pays for it
  • Test sheet written by hand for every panel
  • An overfilled duct is found while wiring
  • Every wire: number, from, to, size, colour, cut and strip length
  • Grouped cut list for the cutting table or a machine
  • Printable test and inspection sheet
  • Module gaps, section fill, duct fill and gland plate are checked
3:14
Lesson 14Send to AutoCADDesign · card 3g
  • Full drawing set drawn sheet by sheet by a draughtsman
  • Feeder data typed again into schedules and title blocks
  • Drawings and BOM drift apart after each revision
  • One export carries feeders, ratings, starters and the BOM
  • Cover, index, SLD, GA, circuits for every feeder, terminal plan, schedules
  • Drawings made from the same data as the price
  • Nothing is sent over the internet
2:11
Lesson 15The cost estimate and the BOMEstimate · cards 4, 4b to 4e
  • Every item looked up in the price list
  • Discount and net price worked out line by line
  • Lugs, ferrules and wiring guessed as a percentage
  • One wrong cell breaks the total
  • Feeder-wise BOM with class A, B and C items
  • List price and discount for every item in one list
  • Wiring, terminals and hardware counted, not guessed
  • Labour, packing, transport, contingency and GST shown step by step
3:37
Lesson 16Use your stock, and edit in ExcelEstimate · cards 4a and 4f
  • Stock checked by phone with the stores
  • Stock lies unused while new items are bought
  • Edits made in Excel never reach the drawings or the offer
  • Stock that fits a line is proposed, never undersized
  • Download to Excel, change it, upload it back
  • The app remembers your changes for the next estimate
  • A team file shares them inside your company
3:16
Lesson 17Technical and commercial offersQuote
  • Offer typed in Word over the last job's file
  • Data sheet, BOM and price copied from Excel by hand
  • An old client name or a wrong total stays in the document
  • Cover e-mail written again each time
  • Technical Offer: data sheet, GA, IGA and feeder-wise BOM
  • Commercial Offer: price, taxes and terms
  • PDF, Word, Excel and HTML
  • Cover e-mail drafted from the estimate, with deviations
3:54
Lesson 18Your price lists and selection chartsMaster data · cards 1b to 1f
  • Price list PDFs searched for every item
  • Type 2 chart read for every motor
  • A new price list means pricing old sheets again by hand
  • Import each maker's price list from Excel or CSV
  • Class A, B, C and your discount kept with each item
  • Type 2 chart picks contactor and overload by motor kW
  • A new list in, and every estimate uses it
4:30
Lesson 19Tally link, and teaching from your own sheetsMaster data
  • Purchase rates checked in Tally in another window
  • Stock and last purchase rate unknown while quoting
  • Your way of estimating lives in one person's Excel
  • Item master and purchase rates read from Tally, read-only
  • Stock and last rate beside every line
  • Shortage and code-mismatch lists
  • A finished sheet teaches your items, prices and discounts
3:58
Lesson 20Make converterMake converter
  • Two catalogues open side by side for every line
  • kA or poles missed in the alternate make
  • The work repeated for every enquiry
  • Upload or paste a BOM in one make
  • Equivalent series and a specification line in the other makes
  • Catalogue numbers from your item master when the specification matches
  • Teach it from a BOQ you already converted
3:19
Lesson 21Projects, revisions and learningProjects
  • Files named final, final 2 and final revised
  • No record of what changed between revisions
  • Actual cost never compared with the estimate
  • Backups depend on one computer
  • Every save is a revision: R0, R1, R2
  • Two revisions compared, with what changed
  • Record actual cost and hours, and the app learns your ratio
  • Export all jobs, or a password-protected backup
3:48
Lesson 22Intelligent MCCInputs · card 1b
  • Relays, switches, gateway and 24 V supply listed by hand
  • Node addresses kept in a separate sheet
  • Network drawing made apart from the panel drawings
  • Every DOL and star-delta feeder gets its intelligent relay
  • Switches, gateway, supply and addresses sized and priced
  • Network sheet and node list drawn
  • Works with every switchgear make
2:32
Lesson 23APFC panelInputs · card 1b
  • kVAr worked out on a calculator
  • Step sizes chosen by habit
  • Reactor, capacitor voltage and incomer taken from separate tables
  • Resonance with the transformer rarely checked
  • kVAr from the load and the power factors
  • Steps proposed and written to the load list
  • Capacitor, reactor, contactor or thyristor for each step
  • Incomer at 1.5 times, resonance checked
2:50
Lesson 24Active harmonic filter panelInputs · card 1b
  • Filter current taken from a quick guess
  • CT position explained over the phone
  • Modules, breakers and ventilation listed by hand
  • Filter current from the non-linear load and its distortion
  • Made up of modules, each with its breaker
  • Sensing CTs and their direction on the connection sheet
  • Ventilation counted
2:21
Lesson 25Bus duct runsBus duct
  • Route measured on the layout drawing
  • Elbows, joints and hangers counted by hand
  • Priced apart from the panel
  • Describe the route: up 3; right 12; down 2.5
  • Elbows, joints and hangers counted
  • Costed from your own rates
  • Added to the estimate and the BOM
2:31
Lesson 26PCC, DG synchronising and distribution boardsInputs · cards 1, 2 and 7
  • A different Excel template for every kind of panel
  • ACB or MCCB decided feeder by feeder
  • Bus couplers and synchronising sets added from memory
  • One load list for every kind of switchboard
  • Large feeders take ACBs, small ones MCCBs or MCBs, by themselves
  • Incomers, bus couplers and DG synchronising sets are counted
  • The panel type prints on the offer and the drawings
3:47
Lesson 27PLC panel on Allen-BradleyInputs · card 1b
  • Controller and modules picked from the selection guide by hand
  • Rack limits and power budget checked in a sheet
  • Relays, fuses and terminals counted per I/O point
  • Engineering hours guessed
  • Type the I/O count: controller, modules and racks are chosen
  • 24 V DC supply, relays, fuses and terminals sized
  • Architecture, module schedule and panel layout drawn
  • Engineering hours counted, at your own rate
4:21
Lesson 28DCS panel on PlantPAxInputs · card 1b
  • Redundant chassis, HART modules and ring worked out from several manuals
  • Servers and workstations counted from the guide
  • Software licences listed from memory
  • Redundant process controllers, HART I/O on a device-level ring
  • PlantPAx servers and workstations sized
  • Two architecture sheets
  • A reminder to confirm in Rockwell's PlantPAx System Estimator
3:20
Lesson 29SCADA systemInputs · card 1b
  • Licence sizes chosen from the price list by hand
  • Computers, network and UPS remembered only at the order
  • Engineering hours guessed
  • Tags, stations, redundancy and historian in; licences out
  • Computers, network, UPS and furniture listed
  • Engineering hours from displays and tags, at your rate
  • Architecture sheet drawn
2:42

The left column describes common practice, not a measurement. What the application works out is an estimating and design aid: check dimensions, wire lengths and hardware counts against your own shop standards and the maker's catalogue before you build.

About these lessons

Recorded in the application itself

Every lesson is a screen recording of version 1.18, driven step by step. Nothing is mocked up. The job, the client, the price lists and the Tally stock in the lessons are made up for the purpose.

Every lesson is narrated in English, and each step also has a caption, so a lesson can be followed with the sound off. Use the steps beside the video to jump to the point you need, and the speed button to go faster.

Next

Try it on your own enquiry

The demo runs for 24 hours from the first start, with every function open. Take a real enquiry and follow lessons 1 and 2.

Download the demo Ask for a walk-through