BIRADAR PANELPRO
Coming next · part of Prakriya

Batch optimiser: find your golden batch and repeat it

Every plant has had batches that ran better than the rest. The batch optimiser reads months of your history, finds the settings those batches share, and proposes the next step inside the limits your engineer sets. The operator accepts every change and the PLC keeps its interlocks.

Join the waitlist

Leave an e-mail address or a WhatsApp number. We will write when there is a version to try.

How it will work

Three steps to the golden batch

The golden batch is not simply the best batch you ever made. One very good batch is often luck. The optimiser looks for what the good batches have in common. Read the guide to the golden batch.

1. Score every batch

Batches are ranked by the result that matters to you, such as yield, cost, energy or coke rate. Only batches that met every quality limit count. A high-yield batch that broke the impurity limit is not golden.

Results inside quality limits

2. Separate the settings from luck

Good raw material or a cool day can make one batch shine. The optimiser sets aside what the operator cannot control and looks for the settings the good batches share.

Settings, not conditions

3. Propose a step, not a leap

You get target settings inside your limits, the gain to expect, and a trial plan: the first step, how many batches to run, and when to stop and go back.

One step at a time
What you get

Advice you can check

Nothing is a black box. Each proposal shows the settings, the limits it stayed inside and the gain it expects, so the process engineer can agree or disagree with it.

Settings

Optimum settings under your limits

The engineer gives each setting its allowed range and each quality result its limit. The optimiser works only inside them.

What if

Try a change on paper first

Move a setting and see what the history says would happen to the result and to quality, before anything changes at the plant.

Trial plan

A plan the shift can follow

The first step, the number of batches to run at it, what to watch, and the point at which to stop and go back.

Proof

Did the change work?

After the trial batches, the new data is compared with the old. The optimiser confirms the gain or tells you to go back.

Who changes the setpoint

The PLC stays the safety layer

The optimiser sits above the control system, the way supervisory optimisers are normally applied in industry. You choose how far it goes. Most plants will stop at the second level.

LevelWhat happensWho changes the setpoint
1. AdviceHistory comes from the historian, the SCADA reports or the shift log. The optimiser gives target settings and a trial plan. Nothing is connected to the PLC.The operator, on the HMI you already have
2. Operator acceptThe proposal goes to an advice block in the PLC. The block holds it inside the engineer's limits, moves one step at a time, and returns to the last good value on a trip or a lost link.The operator presses Accept; the PLC applies the step
3. Supervised autoWith Auto switched on by the operator, the PLC takes one step at each batch end. Auto switches off on a trip or a lost link and stays off until the operator turns it on again.The PLC, inside limits the engineer has signed off

At every level the limits, the Accept button and the Auto switch stay with the engineer and the operator. The optimiser cannot change them. The third level needs the approval of the site and a management-of-change review.

What it needs

The history you already keep

Three to six months of history, with one row for each batch, shift or day: the settings, the conditions and the results. It can come from the historian, from SCADA or batch reports, or from the shift log in Excel.

Water treatment (WTP)
Effluent treatment (ETP)
Sewage treatment (STP)
Compressed biogas (CBG)
Blast furnace
Sinter plant
Pellet plant
Rolling mill

The plants it is being prepared for first. For each one it carries the usual results and the settings that move them.

Questions

What plant teams ask first

Something else? Write to neelpankaj@biradars.com.

Does the optimiser control my plant?

No. On its own it only advises. If you choose the operator-accept level, the PLC applies a proposal only after the operator presses Accept, and only inside the limits the engineer has set. The optimiser cannot change limits or interlocks.

How much history does it need?

Three to six months is a good start, with one row for each batch, shift or day. More batches make the advice firmer.

Do I need a historian?

No. A historian or SCADA report is the easiest source, but batch reports and a shift log kept in Excel work as well.

What if a change makes things worse?

The trial plan says how many batches to run and when to stop and go back. At the operator-accept level the PLC itself returns to the last good value on a trip or when the link is lost.

Which plants is it for?

Any plant that runs in batches, shifts or campaigns. It is being prepared first for water, effluent and sewage treatment, compressed biogas, blast furnaces, sinter and pellet plants and rolling mills.

When will it be ready?

It is in development as part of Prakriya and has no release date yet. People on the waitlist hear first.

Be among the first to try it

The batch optimiser is part of Prakriya, our PLC and SCADA program generator. Leave an e-mail address or a WhatsApp number and we will write when there is a version to try.