Start here
The conventional way
- Costing in Excel, typed line by line from the price list
- GA, single-line diagram and circuits drawn separately in AutoCAD
- Offer typed in Word, numbers copied across by hand
- One changed feeder means correcting all three files
With PanelPro
- One load list drives the price, the drawings and the offer
- Tabs follow the job, from Enquiry to Quote
- Change a feeder and every number and sheet follows
- Automatic checks point to what is still missing
- The tabs follow the job from left to right: Enquiry, Inputs, Design, Estimate, Quote.
- The header shows the offer price all the time, with and without GST, whichever tab you are on.
- The Dashboard sums the job up: price, feeders, sections, overall size, direct cost and mark-up.
- "Where the price goes" splits the price into material, labour, packing and transport, contingency and mark-up.
- Automatic checks list what is missing or unusual: built-in prices still in use, items without a part number, a layout close to its limit.
- Each check has a "go to fix" link. It opens the place where that item is corrected.
- Here it opened the Master data tab, where your price lists are loaded.
- Quick actions: save a revision, or download the Excel estimate, the offer PDF, the GA and IGA drawings and the production Excel.
- Every tab is a set of numbered cards. On Inputs: panel selections, enclosure, load list, discounts and rates.
- Click a card heading to fold it away. Click again to open it.
- "Collapse all" and "Expand all" sit just under the header.
- Design holds what you would otherwise draw in AutoCAD: sections, busbar, GA and IGA, schematics, production data and wire lists.
- Estimate holds what you would otherwise build in Excel: the cost, the cable schedule, the feeder-wise BOM, the master list and the labour hours.
- Quote holds what you would otherwise type in Word: the technical offer, the commercial offer and the cover e-mail.
- Master data keeps your own price lists, selection charts and the Tally link.
- Projects saves every estimate with its revisions, and learns from finished jobs.
- Help gives the suggested workflow, tab by tab.
- About explains your data and privacy, the permissions, the terms and how to reach support.
Remember: Work left to right through the tabs · The header always shows the offer price · Clear the Dashboard checks before sending · Your estimates are saved on your own device
Watch lesson 1
The conventional way
- Read the whole tender to find the lines about your panel
- Note IP, form, fault level and busbar on paper, then type them in
- A value meant for the HT panel or a motor slips into the LT panel
- Retype the feeder list into Excel
With PanelPro
- Open PDF, Excel, Word, e-mail, pictures or ZIP, or paste the text
- Each value is shown with the sentence it came from
- Values about other equipment are set aside, with the reason
- Feeder lists become the load list, only when you apply
- Any file type is read on your own device: PDF, scanned pages, Excel, Word, PowerPoint, e-mail with attachments, pictures, ZIP folders, DXF.
- Open the customer's files here, several at once, or drop them on the card. Or paste the text.
- Here a made-up tender for a dairy plant is pasted: HT switchgear, a transformer, the LT panels, motors and commercial terms.
- Click "Read enquiry". Nothing is downloaded and nothing is sent anywhere.
- The built-in reader divides the tender into its parts: HT switchgear, transformer, the LT panel, motors, commercial terms.
- Every value is shown with the sentence it came from and the heading it stood under: IP 54, Form 3b, 50 kA, aluminium busbar.
- Change a value with its drop-down, or untick a row you do not want applied.
- The feeder list inside the tender is read as feeders: MCCBs, MCBs, the pumps and the compressor, with ratings and quantities.
- A sentence of the specification that only mentions a rating is not turned into a feeder. It is listed here in case you want it.
- "Set aside" holds what the tender says about other equipment: the HT panel's IP 4X, the motor's IP 55, the transformer's temperature rise.
- Each one shows its reason. If one does belong to your panel, take it with one click.
- Nothing changes until you click "Apply to the estimate".
- The Inputs tab now carries the specification from the tender, each value waiting for your confirmation,
- and the load list, with every feeder that was found.
Remember: Open the files or paste the text · Review what was found, with its sentence · Check what was set aside · Apply to the estimate
Watch lesson 2
The conventional way
- Count feeders off the single-line diagram by hand
- Retype a consultant's BOM to price it again
- Type every feeder row by row, even for a budget price
With PanelPro
- A CAD single-line diagram in PDF is read panel by panel
- Your own BOM in Excel becomes the load list and the prices
- Type or dictate: add 3 pumps 22 kW DOL
- Similar past jobs appear beside the new enquiry
- A single-line diagram saved from CAD as PDF is read exactly, from its own wording. A scan or a photo is read as a picture and needs checking.
- Here a made-up plant single-line diagram is opened with the enquiry files.
- Two panels were found on the sheet. Choose the one to estimate: the main PCC with 12 outgoing feeders and 2 incomers, or the capacitor panel.
- The busbar rating, fault level, poles and material come from the lettering beside the busbar and the incomers.
- Every outgoing feeder is read with its rating, its destination and its load, and spares are counted. A panel shown twice on the sheet is counted once.
- Review the list, then "Apply to the estimate", as with any enquiry.
- Quick add: type the feeders in plain words, or dictate them with your keyboard's microphone.
- Three DOL pumps and two soft-starter fans are added to the load list.
- "Start from your BOM": upload a bill of materials in Excel or CSV. Columns are found by themselves: description, catalogue number, make, quantity, rate, discount, feeder.
- Every switchgear line is recognised: the incomer ACB, the motor starters with their kW, the breaker feeders, the drive.
- One click makes the load list from it. Tick the box and the estimate is priced from your BOM lines.
- "Similar jobs you have done" fills in from your saved projects, with what was won, lost or delivered.
- "Still to be entered by you" lists the specification values not yet confirmed and the rates not yet entered. Nothing is assumed for you.
Remember: A CAD drawing as PDF: choose the panel · A BOM in Excel or CSV: make the load list · Quick add for a fast budget · Check "Still to be entered by you"
Watch lesson 3
The conventional way
- Fault level copied from the enquiry, never checked against the transformer
- Conflicting values in the tender found only after the order
- Clarification e-mail written from scratch every time
- Cheaper alternatives depend on who remembers them
With PanelPro
- Fault level worked out from the transformer and DG, with motor contribution
- Conflicts and gaps listed as findings
- Questions for the client ready to copy or e-mail
- Alternatives you can offer, with a typical saving range
- This card checks the short-circuit ratings against the real supply, and finds values in the enquiry that contradict each other.
- Enter the transformer that feeds the panel: 1600 kVA, 6.25 % impedance.
- Add the DG set, if there is one, and say whether it can run in parallel with the transformer.
- Motor feeders add to the fault current. The app counts their contribution from the load list.
- The table shows the build-up: transformer, DG and motors, the fault level at the board, the peak current, and what the panel and the breakers withstand.
- Findings: the fault level from this supply is 39.5 kA. The 36 kA feeder breakers are below it, so the app asks for the maker's back-up table or a higher rating.
- Each finding says what to do about it, and names the standard clause it rests on.
- Internal arc to IEC/TR 61641: arcing class, test current and duration, with or without an arc-flash relay.
- One click adds the arc-protection items to the estimate, for you to price.
- Alternatives you can offer: here aluminium busbar in place of copper, with its typical saving range.
- Offer them as options. The base offer stays as specified.
- Questions for the client are written for you from what the enquiry leaves open.
- Copy them, open them in your e-mail program, or download them as text. Nothing is sent from the app.
- The engineering notes, with the standards and the verification method, can be printed in the Technical Offer.
Remember: Enter the transformer and DG · Read the findings · Send the questions before you quote · Offer the alternatives as options
Watch lesson 4
Inputs
The conventional way
- Specification spread across the tender, the e-mails and your notes
- kA, form and IP remembered while picking every item
- A missed clause turns into a deviation after the order
With PanelPro
- Every choice of the panel in one card
- Each value is confirmed by you, none is assumed
- Breakers, busbar and enclosure follow these choices
- 8 switchgear makes and 11 panel types
- A new estimate starts with nothing chosen. Every specification item reads "-- select --" until you choose it, or apply it from the enquiry.
- Switchgear make: ABB, Schneider, Siemens, L&T, Legrand, C&S, Havells or Eaton. Breakers, contactors and relays are taken from this make.
- Panel type: MCC, intelligent MCC, PCC, APFC, DG synchronising, harmonic filter, metering, distribution board, PLC, DCS or SCADA.
- Short-circuit withstand of the panel, and the breaking capacity of the incomer and of the feeders.
- Form of separation, from 2A to 4B.
- Busbar material and position, and the protection release of the incomer.
- Enclosure sheet material: CRCA, SS304 or SS316. And the enclosure IP.
- Sizing rules are choices too: motor current from the standard motor table, and how the breaker and busbar ratings are stepped.
- How feeders are built is chosen here as well: the incomer package, the feeder kit style, and auxiliary contactors or plug-in relays for control.
- The rest are confirmed the same way: voltage, frequency, cable entry, poles, neutral, earth busbar, cable material, lamps and heaters, control supply.
- Your company name, address and signatory go on the letterhead of the offer.
- Client, project and offer reference print on the offer and in the title block of every drawing.
- Change a choice and the price in the header follows at once. Here the panel goes from 50 kA to 65 kA.
- The same choices fill the technical data sheet of the offer. Nothing is typed twice.
Remember: Confirm every specification value · Make and panel type first · kA, form, IP and busbar · Your letterhead details print on the offer
Watch lesson 5
The conventional way
- Enclosure priced by a thumb rule per section
- Cubicle sizes of each make looked up in catalogues
- Own fabrication costed in a separate sheet
With PanelPro
- 13 enclosure systems, or your own fabrication
- OEM sections priced from that maker's own price list
- Your own formula per section and per panel
- Assembly hours counted for OEM systems
- Card 1a: who makes the enclosure. Your own fabrication, shown under your company name, or a type-tested OEM system.
- Thirteen systems are listed: Rittal VX25, Schneider PrismaSeT P and Blokset, Cubic, Siemens SIVACON S8, ABB MNS, L&K, Hoffman, Invent, L-Steel, Eaton xEnergy, Legrand XL3 and Eldon.
- Your own enclosure is priced by sheet-metal calculation: kilograms of sheet, fabrication, powder coating, locks and gasket, all at your own rates.
- Or by your own formula: an amount per section, and an amount once per panel.
- "Formula names you can use" lists what a formula may refer to, such as the width, depth and height of the section.
- Now choose an OEM system: Rittal VX25.
- An OEM system is priced section by section from that maker's own price list. Each section of the GA takes the smallest listed size that fits its width, depth and height.
- Import the price list from Excel or CSV, add the standard sizes, or add sizes one at a time.
- The standard sizes are listed, ready for the prices from your list.
- Your discount on that maker's list prices, and a formula per section and per panel for what you add.
- Assembly hours per section are counted for a system that you assemble instead of fabricate.
- A maker that is not listed can be added with its own price list.
- The estimate then prices the enclosure the way you chose.
Remember: Choose the enclosure make · Own make: sheet-metal calculation or your formula · OEM system: import its price list · Set your discount and assembly hours
Watch lesson 6
The conventional way
- One Excel row per feeder, with breaker, contactor and relay picked by hand
- Motor current looked up in a table for every rating
- Type 2 chart opened for every starter
- Quantities multiplied by hand
With PanelPro
- Type kW and starter type: breaker, contactor, overload and cable follow
- Import from Excel or CSV, or paste the list
- MPCB, MCCB, MCB or switch-fuse per feeder
- Quantity and cable length in the same row
- Card 2a brings in a load list from any file: Excel, CSV, Word, PDF, e-mail, pictures, or pasted text. You review every line before it is added.
- The CSV template shows the columns, if you want to prepare a list in Excel.
- Here three more feeders are pasted as plain text.
- The lines are read into feeders with type, kW or amperes and quantity. A type shown in orange was assumed from the kW: change it where your practice differs.
- Add the ticked lines to the load list, or replace the list with them.
- Card 2 is the load list. One row is one feeder: name, type, protection, kW, quantity, power factor, rated amperes and cable length.
- The current comes from the standard motor table.
- The protection device and its rating are selected for you: here an MPCB for a 22 kW motor.
- And the row shows what that feeder costs, with everything inside it.
- Eight feeder types: breaker only, DOL, star-delta, soft starter, VFD, capacitor stage, heater or contactor feeder, single-phase MCB feeder.
- Change a starter type and the contactors, overload relay, timer, cable and price of that feeder change with it.
- An outgoing feeder needs only its rated amperes.
- Protection, per feeder: Auto, MCCB, MPCB, MCB or switch-fuse. Auto takes an MPCB for motor feeders up to 63 A.
- Or set the protection for all feeders of one type in a single step.
- Every DOL feeder now has an MCCB, and the prices have followed.
- "+ Add feeder" adds a row. Name it, choose its type, give the kW or the amperes.
- Quantity multiplies the feeder everywhere: in the bill of materials, the sections, the drawings and the price.
- Cable length feeds the cable schedule and the voltage-drop check.
- From these rows the app has built the whole bill of materials: 200 lines, feeder by feeder. None of it was typed.
Remember: Import, paste or add feeders · kW and starter type for motors · Ampere rating for outgoing feeders · Cable length for the cable schedule
Watch lesson 7
The conventional way
- Discount typed against every line of the sheet
- A copper rate change means editing many cells
- Margin formula differs from sheet to sheet
With PanelPro
- One discount per switchgear group, and per type if you wish
- Your own rates in one card: steel, copper, labour, packing
- One margin rule on every job
- Change a rate and the whole estimate follows
- Card 6 holds the discounts your suppliers give you, by group: MCCB, ACB, contactors and starters, capacitors, meters, CTs, relays, lamps, accessories and MCBs.
- A discount for each switchgear type goes finer: MPCB, RCCB, switch-fuse, power contactors, overload relays, soft starters, drives, reactors, terminals. Left blank, the group discount applies.
- Change one discount: MCCB from 38 to 42 per cent. The header price follows.
- Card 7: rates and loadings. A star marks a rate that is yours. On a new installation these are blank: the app never assumes your prices.
- Sheet steel, fabrication, powder coating, locks and gasket price your own enclosure.
- Copper and aluminium rates per kilogram price the busbar. When copper moves, change one number.
- Labour in hours: CAD, fabrication per kilogram, busbar work, wiring per feeder and testing per section, at your rate per hour.
- Sizing rules are yours as well: diversity factor, breaker sizing factor, incomer margin, the largest busbar and the number of runs.
- The margin is one number, the conversion divisor: 75 means cost divided by 0.75, a 33 per cent mark-up on cost.
- Packing per section, transport, contingency and GST complete the price. Validity and delivery print on the offer.
- "Labour method" in card 1 decides whether labour is a percentage of material or these hours.
- The cost estimate uses these numbers in the open: material, labour, the divisor, packing, transport, contingency, GST.
Remember: Your discounts by group and type · Starred rates are yours to enter · Labour as a percentage or in hours · Divisor, packing, transport and GST
Watch lesson 8
Design and drawings
The conventional way
- Busbar size taken from a chart or from habit
- Derating for ambient, altitude and IP often skipped
- Calculations made in a separate sheet, only when the client insists
With PanelPro
- Busbar chosen from current density with derating
- Cross-section checked for the fault current and its duration
- Electrodynamic stress and temperature rise calculated
- One tick puts each calculation in the Technical Offer
- Card 3 works the busbar out from the load list: connected current, demand after diversity, the incomer, the busbar size and runs, the sections and the bus weight.
- The current density is derated for ambient temperature, altitude and enclosure IP, and the cross-section is checked against the fault current and its duration.
- Ambient temperature and altitude are entered once, in card 7 of Inputs. Raise the ambient from 40 to 50 degrees.
- The derating is applied and the busbar is selected again. No chart to look up.
- You can still fix the size yourself: "Busbar size" in card 1 lists the standard bars, or takes a custom one.
- Card 3d holds two calculations. Tick either one to print it in the Technical Offer.
- Busbar size: design current, derated current density, short-time withstand, peak factor and peak current, phase spacing and support span.
- The result sets the chosen bar against each requirement: current capacity, thermal withstand during the fault, and the force between phases.
- Change the phase spacing or the support span and the stress is worked out again.
- Temperature rise: the heat given off inside each section is set against what the enclosure can shed, for the air temperature you allow.
- These are offer-stage calculations. Final verification is by test or by comparison with a tested design, as IEC 61439 requires. The card says so.
- With the boxes ticked, both calculations are printed in the Technical Offer.
Remember: Demand, incomer and busbar are worked out · Derating for ambient, altitude and IP · Check spacing and support span · Tick to include in the Technical Offer
Watch lesson 9
The conventional way
- Front view drawn in AutoCAD, module by module
- Number of sections found by trial and error
- Drawing redone when a feeder is added
- Dimensions typed by hand into the offer
With PanelPro
- Sections, length, depth and height worked out from the load list
- GA with elevation and plan, IGA with every module
- DXF for AutoCAD, Visio or EPLAN, and SVG
- Module sizes are yours to edit, and the drawings follow
- Card 3a works out the sections, the overall length, depth and height from the load list, then draws the GA and the IGA.
- Set the front arrangement, single or back to back, the panel height, the plinth, the busbar chamber and the end clearances.
- The result: number of sections, each section's width and depth, and the overall size of the panel.
- The GA: front elevation with every door and module, and the plan with the depth of each section.
- The IGA: the internal arrangement, module by module, with feeder name and rating in each compartment.
- Module heights are engineering defaults that you can edit: a height for each kind and size of feeder.
- Make the DOL starter module for 18.5 to 45 kW taller: 400 to 500 mm.
- The modules are packed into the sections again, and the section count and the overall length follow.
- Both drawings are redrawn. In AutoCAD every module would be moved by hand.
- Presets switch a whole set of assumptions: compact MCC with MPCB modules, or the standard defaults.
- Cubicle widths and depths follow the switchgear or enclosure make. Confirm them against the maker's current catalogue before construction.
- "Use these sections and sizes in costing" makes the estimate price exactly the sections that are drawn.
- Download the GA and the IGA as DXF. They open in AutoCAD and Visio, to scale, in millimetres, with layers.
- SVG is for viewing, e-mailing or pasting into a document.
- The module-wise BOM lists the parts of every compartment, for EPLAN or for production.
- The section schedule gives each section's size and what it holds, and downloads as CSV.
Remember: Check height, plinth and busbar chamber · Edit module heights to your standard · Download GA and IGA as DXF · Section schedule and module-wise BOM
Watch lesson 10
The conventional way
- SLD drawn feeder by feeder in AutoCAD
- DOL and star-delta circuits copied from an old job and edited
- Feeder schedule typed again inside the drawing
- Device lists for EPLAN typed by hand
With PanelPro
- SLD in the order of the panel, from the same feeders
- A typical power and control circuit for every starter type used
- Feeder schedule on its own sheet
- DXF sheets, and device and parts lists for EPLAN
- Card 3c draws the schematics from the same feeder list and GA as the estimate. Sheets are A3 landscape, in millimetres, with layers by function.
- Sheet 1 is the single-line diagram: incomer, busbar and every feeder in the order of the panel, with breaker, starter and motor rating.
- "Next" and "Previous" step through the sheets.
- A typical power and control circuit is drawn for each starter type in the load list. Here the DOL starter on a motor protection breaker: breaker, contactor, start, stop and lamps.
- The star-delta starter: main, star and delta contactors with the timer.
- The VFD feeder, with its drive and control terminals.
- And the plain outgoing feeder. Wire numbers and device tags are on every sheet.
- The last sheet is the feeder schedule: every feeder in module order, with its type, kW, rating and module height.
- Download the SLD with its schedule, the typical circuits, or all schematics, as DXF. They open in AutoCAD and Visio.
- For EPLAN, the device list gives the devices of each section,
- and the parts list gives one line per part number, for the parts database.
- "This sheet (SVG)" saves the sheet on screen as a picture.
- The title block carries your company, the client, the project, the drawing number and the revision, from the estimate.
- The schematics are for design review. Verify them against the make's catalogue and the site requirements before building.
Remember: Step through the sheets · Download SLD and circuits as DXF · Device and parts lists as CSV · Verify before building
Watch lesson 11
Lesson 12 · Design · card 3b · 3:07Production data for the shop floor
Busbar cut list, hardware, cables, glands, ducts, ferrules and labels
The conventional way
- Busbar lengths measured off the drawing
- Hardware, glands and lugs counted by the storekeeper
- Ferrule and label lists typed in Excel
- Gland plate marked out on the shop floor
With PanelPro
- Busbar cut list with supports, bolts and hardware
- Cable schedule, glands and lugs by cable size
- Gland plate drawings with a hole schedule
- Ferrules, labels and ducts in one Excel production pack
- Card 3b turns the GA and the load list into production quantities. Every line shows its size, length and quantity.
- Set your shop rules once: sections per shipping split, support pitch, cable slack, wastage for busbar and duct.
- The cable schedule sizes the power cable of every feeder, with the control cables for motor feeders.
- The busbar cut list: each bar with its size, cut length and quantity, horizontal and vertical, phase, neutral and earth.
- Supports, bolts, nuts and washers are counted from the bars and the joints.
- Cable glands and lugs, by cable size and count.
- The cable alley is checked against the cables that have to pass through it, section by section.
- The gland plate hole schedule gives fabrication the hole sizes and positions.
- The fastener schedule lists every size of bolt, nut and washer.
- Wiring ducts by size, with length and wastage.
- Ferrules, counted by wire size.
- Labels and nameplates: the text for every feeder door, ready for engraving.
- Every rule used is listed under "Assumptions", so you can check it against your own practice.
- Gland plate drawings and the alley, spreader and joint details download as DXF or SVG.
- "Preview here" shows the detail drawing on the card.
- "Download production pack" puts all of it into one Excel workbook for the shop floor. Cable, ferrule and label lists also download as CSV.
Remember: Set slack, pitch and wastage once · Busbar cut list and hardware · Gland plates as DXF · Download the production pack
Watch lesson 12
The conventional way
- Wires measured and cut one by one at the panel
- No wire list unless the client pays for it
- Test sheet written by hand for every panel
- An overfilled duct is found while wiring
With PanelPro
- Every wire: number, from, to, size, colour, cut and strip length
- Grouped cut list for the cutting table or a machine
- Printable test and inspection sheet
- Module gaps, section fill, duct fill and gland plate are checked
- Card 3e lists every wire of the control and internal power wiring: wire number, from, to, size, colour, cut length, strip length and ferrule or lug.
- For this panel: 307 wires and 614 wire ends, sorted into 64 cut groups. Nobody counted them.
- Set the control wire size and colour, the extra length added to every wire, the in-panel derating and the wastage.
- The summary gives the metres of each size and colour to draw from the store, with wastage.
- The cut list groups wires of the same size, colour and length, for the cutting table or a wire-processing machine.
- The point-to-point list tells the wireman where each wire starts and ends, with its ferrule number.
- Strip lengths per wire size are yours to edit.
- Each list downloads as CSV. A wire-processing machine imports the cut list directly.
- The test sheet is a printable inspection and test record for the factory acceptance test, made for this panel.
- It is a typical-scheme list. Check it against your own schematic before wiring.
- Card 3f checks the layout: 19 checks here, 15 passed and 4 close to a limit.
- Each line names the section and the check: module stack height, gap between modules, wiring duct fill from the wire list, gland plate area.
- The limits are yours: minimum gap, highest duct fill, the share of wires in the vertical duct.
- A layout near its limit also shows on the Dashboard, before the panel reaches the shop floor.
Remember: Set wire size, colour and strip lengths · Cut list for the cutting table · Print the test sheet · Clear the layout checks
Watch lesson 13
The conventional way
- Full drawing set drawn sheet by sheet by a draughtsman
- Feeder data typed again into schedules and title blocks
- Drawings and BOM drift apart after each revision
With PanelPro
- One export carries feeders, ratings, starters and the BOM
- Cover, index, SLD, GA, circuits for every feeder, terminal plan, schedules
- Drawings made from the same data as the price
- Nothing is sent over the internet
- Card 3g hands the whole panel to PanelPro CAD, which draws the full electrical set in AutoCAD on your PC.
- The set: cover and index, SLD, GA, busbar sheet, power and control circuits for every feeder, terminal plan, cable and wiring schedules, BOM and a standards check.
- It uses the feeders, ratings, starters and the feeder-wise BOM of this estimate. Nothing is typed again.
- "Export for AutoCAD" saves one ZIP file with the project data.
- Unzip it into the projects folder of PanelPro CAD and drag project.yaml onto RUN_DESIGN.bat.
- For PanelPro Drawing Studio, save the .json file, type PPDESIGN in AutoCAD and pick it.
- Both files stay on your computer. Nothing is sent over the internet.
- For a quick look without AutoCAD, the schematics in card 3c and the GA in card 3a are already drawn here.
Remember: Finish the estimate first · Export for AutoCAD (.zip) · Run it in PanelPro CAD on your PC · Or open the .json in Drawing Studio
Watch lesson 14
Estimate
The conventional way
- Every item looked up in the price list
- Discount and net price worked out line by line
- Lugs, ferrules and wiring guessed as a percentage
- One wrong cell breaks the total
With PanelPro
- Feeder-wise BOM with class A, B and C items
- List price and discount for every item in one list
- Wiring, terminals and hardware counted, not guessed
- Labour, packing, transport, contingency and GST shown step by step
- Card 4 builds the price in the open. Material is totalled by class: A for breakers, drives and capacitors, B for contactors, relays, meters and CTs, C for terminals, lamps, wiring and hardware, then busbar and enclosure.
- Each class shows its number of lines, its list value, the effective discount and the net cost.
- Then, step by step: labour, the conversion divisor, packing, transport, contingency, the offer price rounded up to the thousand, GST, and the amount in words.
- Card 4b is the cable schedule: full-load current, cable size, derated capacity and voltage drop of every feeder, for the lengths in the load list. Cable cost is kept out of the panel price.
- Card 4c is the feeder-wise BOM. Under each feeder, every part: class, description, make, code, quantity, list price, discount and net.
- One 22 kW DOL starter: motor breaker, contactor and overload relay from the Type 2 chart, then control MCB, push buttons, lamps, terminals, wires, lugs and ferrules.
- This panel has 153 lines in 9 groups. In Excel each would be looked up, typed and multiplied by hand.
- Card 4d lists every item of the estimate once, and says how much of the material is priced from your own master.
- Change a list price or a discount here and the estimate, the BOM, the offer and the Excel all follow. An orange border marks your override.
- The Source column says where each price came from. With Tally linked, stock and the last purchase rate stand beside every line.
- Card 4e gives the labour hours by activity: CAD and drawings, sheet-metal fabrication, busbar work, control wiring and testing.
- "Download Excel estimate" on the Quote tab gives the whole estimate as a workbook: summary, BOM, labour, cable schedule. With production data in the second button.
Remember: Read the cost build-up · Feeder-wise BOM for production · Change a price once in the master list · Labour hours by activity
Watch lesson 15
The conventional way
- Stock checked by phone with the stores
- Stock lies unused while new items are bought
- Edits made in Excel never reach the drawings or the offer
With PanelPro
- Stock that fits a line is proposed, never undersized
- Download to Excel, change it, upload it back
- The app remembers your changes for the next estimate
- A team file shares them inside your company
- Card 4a checks your stock for items that can stand in for lines of this estimate: same make and poles, equal or higher kA, or one rating up with the release set at the required current.
- MCBs, fixed-trip breakers, overload relays and MPCBs are never upsized.
- Stock comes from Tally, or from a stock list in Excel or CSV: code, quantity, purchase rate, last purchase date. Here a made-up list of five items.
- Suggestions appear line by line. The customer is charged for the item asked for. Your cost changes, because you use stock at the rate you paid.
- Each option says why it is allowed: here the same rating with a higher breaking capacity, bought four months ago, and what it saves on this line.
- A larger frame is offered with a warning: check the module space and the terminals.
- The total says how much stock would be used and what it saves. Order the options by lowest cost or by oldest stock.
- "Use" puts the stock item into the estimate. "Use first option for all lines" takes them all.
- Card 4f is for those who like to finish in Excel. Download the estimate, in the order of the offer BOM, change what you like, and upload it back.
- In Excel: change a description, make, part code, quantity, price or discount. Type Delete in the Action column to remove a line. Add lines in empty rows.
- Here the door lock was given a new make and price, and the space heater was deleted. Upload the edited file.
- The changes are listed and applied. The estimate, the internal BOM and both offers now use them.
- The app also remembers your changes and suggests them in future estimates.
- "Export team learning" saves what the app has learned to a file, for colleagues to import. It stays inside your company.
Remember: Upload a stock list or sync Tally · Accept the stock items that fit · Excel: download, change, upload · Export team learning for colleagues
Watch lesson 16
Offer
The conventional way
- Offer typed in Word over the last job's file
- Data sheet, BOM and price copied from Excel by hand
- An old client name or a wrong total stays in the document
- Cover e-mail written again each time
With PanelPro
- Technical Offer: data sheet, GA, IGA and feeder-wise BOM
- Commercial Offer: price, taxes and terms
- PDF, Word, Excel and HTML
- Cover e-mail drafted from the estimate, with deviations
- The Quote tab opens with a cover e-mail written from the estimate: subject, the panel in one paragraph, price, validity, delivery and payment terms.
- Assumptions and deviations come from comparing the enquiry text with the design. Edit it freely.
- Regenerate it after a change, copy it, or open it in your e-mail program. Nothing is sent from the app.
- Card 5 produces two separate documents: the Technical Offer and the Commercial Offer. Both are previewed below.
- Tick the optional sections: the busbar size calculation and the temperature rise calculation.
- The Technical Offer carries your letterhead, the reference, the date, the client and the subject.
- The executive summary states the panel in one sentence: incomers, feeders, sections, make, form, IP, busbar rating and fault level.
- Scope of supply.
- The technical data sheet, filled from your panel selections: standards, voltage, fault level, busbar, enclosure, finish.
- Engineering notes: the standards and the way the design is verified.
- The GA and the IGA drawings are inside the document, with the section schedule.
- The feeder-wise bill of materials, without prices.
- An indicative outgoing cable schedule, and the exclusions from the technical scope.
- The Commercial Offer is its own document, with its own reference.
- Price, GST and the amount in words.
- Commercial exclusions.
- And the terms: payment, delivery, validity and warranty, from your settings.
- Download the Technical Offer as PDF, with GA, IGA and BOM; the Commercial Offer as PDF; or both in one file.
- Both are also available as Word files, to edit, and as HTML.
- The Excel estimate, alone or with the full production BOM.
- "Share offer" passes the summary to WhatsApp or e-mail. "Send offer to CRM" files it with the enquiry in your CRM.
- The price list date prints on the offer. "Copy summary" and "Copy BOM as CSV" put the text on the clipboard.
- No number in these documents was typed by hand. Change the estimate and both offers change with it.
Remember: Read the preview of both offers · Tick the optional calculations · Download PDF or Word · Edit the cover e-mail and send
Watch lesson 17
Your prices
The conventional way
- Price list PDFs searched for every item
- Type 2 chart read for every motor
- A new price list means pricing old sheets again by hand
With PanelPro
- Import each maker's price list from Excel or CSV
- Class A, B, C and your discount kept with each item
- Type 2 chart picks contactor and overload by motor kW
- A new list in, and every estimate uses it
- Card 1b is your item master. All estimate prices come from here: upload your price lists for any make, keep your discounts with the items, and the estimate, BOM and Excel follow.
- It starts empty. The app never ships with your prices: until you load them the estimate uses built-in sample prices, and says so.
- The template gives the columns: class, make, category, description, ordering code, unit, list price, discount, rating and breaking kA.
- Open a price list in CSV or Excel. Here a made-up Schneider list of 93 items is loaded.
- The file is shown first, with the meaning the app gave to each column. Correct a column if your list is laid out differently.
- Say whether the file holds list prices, to which your discounts apply, or your purchase prices. And whether existing items are updated or the make is replaced.
- 93 items are in, counted by make and class, with the date and the file of the last import.
- Breakers are class A, contactors and overload relays class B, each with its code, list price and discount.
- Search by make, category, description or code. Filter by make and by class.
- Give all filtered items one discount in a single step: 42 per cent on the contactors.
- Add single items by hand, set the class of a filtered group, or export the whole master as a backup.
- Card 1c, the breaker selection map, tells the estimate which master item to use for each rating and kA.
- "Auto-match from master" fills the map from the ratings in your list.
- Each rating now shows its ordering code and price for the breaking capacities in your list: here 36 and 50 kA. A column stays empty until a list has those breakers.
- Card 1d is the starter selection map: the Type 2 coordination chart. For each motor kW it names the motor breaker, the contactors and the overload relay.
- Schneider's chart is built in. With the codes now in the master, every DOL and star-delta feeder is priced from the chart, not from a generic estimate.
- For any other make, import its Type 2 chart as CSV. "Chart codes missing from master" lists what your price list still lacks.
- Card 1f takes the ordering codes for MPCBs, MCBs and switch-fuses by rating. A green border means the code was found in the master.
- The estimate reports how much is priced from your own master: after this one list, 13 of 76 items, 40 per cent of the material value. The rest stays marked for you.
- Each line names its source: master, built-in, or your override.
Remember: Download the template · Import your price lists · Bulk discount and class · Check the selection maps
Watch lesson 18
The conventional way
- Purchase rates checked in Tally in another window
- Stock and last purchase rate unknown while quoting
- Your way of estimating lives in one person's Excel
With PanelPro
- Item master and purchase rates read from Tally, read-only
- Stock and last rate beside every line
- Shortage and code-mismatch lists
- A finished sheet teaches your items, prices and discounts
- Bring your own item master and purchase rates from Tally, so that quotes use your real prices. The prices stay on this device.
- First way: in Tally, export the Stock Summary as XML, or as Excel or CSV with Name, Part No, Unit and Rate, and open the file here.
- The items are shown for review, with part number, unit and rate. Nothing has changed yet.
- Press Import. New items are added to the master, and existing ones take your latest purchase rate.
- Second way, in the Windows app: set Tally as server on port 9000, keep the company open, and "Fetch stock items from Tally" reads them directly.
- The Tally ERP link goes further. With the small Tally Bridge program running beside Tally, one click copies stock, last purchase rate, date and supplier for every item.
- It is read-only. Nothing is ever written back to Tally.
- Give the bridge address and its token, the company, and how many years to look back for the last purchase rate.
- Two options: add Tally items that are missing from the master, and bring the list price up to date from the last purchase rate.
- After a sync, three lists help the buyer: what this job needs beyond stock, codes that do not match, and master items Tally does not know.
- And in the estimate, every line shows Tally stock, the last rate, when it was last bought, and a price check.
- "Teach PanelPro from your estimation sheet": upload one of your finished estimation sheets in Excel. Here a made-up sheet.
- The app finds the panels in the sheet and the feeder recipes: which devices you use for an incomer, a DOL starter of a given size, an outgoing feeder.
- It also finds your rates: busbar rate, labour percentage, conversion divisor, transport.
- "Teach PanelPro from this sheet" stores your devices, makes, catalogue numbers, prices and discounts, and the parts you use for each feeder type.
- Terminals, wiring, ferrules, lugs and hardware are still worked out by PanelPro, so the production BOM stays complete.
- "Create one project per panel" turns an old sheet into saved projects, and "Load into this estimate" opens it as the current job.
Remember: Import a Tally export, or link live · Nothing is written back to Tally · Shortage list before you order · Upload one finished estimation sheet
Watch lesson 19
The conventional way
- Two catalogues open side by side for every line
- kA or poles missed in the alternate make
- The work repeated for every enquiry
With PanelPro
- Upload or paste a BOM in one make
- Equivalent series and a specification line in the other makes
- Catalogue numbers from your item master when the specification matches
- Teach it from a BOQ you already converted
- Upload a bill of materials in one make and get the equivalent of every line in other makes, without prices, to ask alternate suppliers for quotes.
- The converter is an add-on, at Rs 499 a month plus GST. With it, full BOMs are converted on our server from a library of verified catalogue numbers.
- Without the add-on, the built-in series table converts the first 10 lines, so you can try it.
- Open the BOM in Excel or CSV, or paste it, one item per line.
- Here five lines of a Siemens BOM are pasted.
- Tick the makes to convert to: ABB, Schneider, Siemens, L&K, Legrand, Eaton.
- The result says how many lines were matched to your item master, how many by series, and how many need checking.
- Each line is first read into its specification: MCCB, 3 pole, 250 A, 36 kA, thermal-magnetic.
- Then the equivalent in each make: ABB Tmax XT, Schneider ComPacT NSX, L&K dsine, each with the same specification for the supplier to quote against.
- The 1600 A draw-out ACB becomes Emax 2, MasterPacT MTZ and U-Power Omega.
- A line that is not read in full is marked "Check". Nothing is guessed silently.
- Where your item master has an item of exactly that specification, its catalogue number is given in place of the series.
- "Download Excel (unpriced)" gives the list to send to the alternate suppliers.
- Teach the converter from a BOQ you have already converted: your own equivalents, with the sub-items you added, are then used first.
- The equivalent series table is yours to edit, product by product and make by make. Series names are guidance: confirm with each maker's current catalogue.
Remember: Paste or upload the BOM · Choose the makes to convert to · Send the unpriced list to suppliers · Full BOMs need the add-on
Watch lesson 20
Projects
The conventional way
- Files named final, final 2 and final revised
- No record of what changed between revisions
- Actual cost never compared with the estimate
- Backups depend on one computer
With PanelPro
- Every save is a revision: R0, R1, R2
- Two revisions compared, with what changed
- Record actual cost and hours, and the app learns your ratio
- Export all jobs, or a password-protected backup
- Projects are saved on this device. Each save adds a revision: R0, R1, R2.
- The job is saved as revision R0, with its client, status and offer price.
- The client now asks for a fourth raw water pump. Change the quantity in the load list.
- "Save revision" stores it as R1. R0 stays exactly as it was quoted.
- Both revisions are listed with their date and price. Open one with today's rates, or "at original rates" to see it exactly as it was quoted.
- "Compare" shows what changed from the previous revision.
- R0 to R1: the offer price, material and labour hours before and after, the feeder that changed, and any change in specification, rates or discounts.
- No hunting through two Excel files to find what is different.
- Set the status as the job moves: Draft, Quoted, Won, Lost or Delivered.
- After delivery, record the real figures: actual material cost, actual labour hours, the final selling price, and what went wrong.
- The project list now shows the material error: how far the estimate was from the real cost.
- Learning: after at least three delivered jobs the app can scale material and labour by your average ratio, limited to between 0.8 and 1.3. It never changes prices silently: you switch it on.
- "Export all" saves every project to one file. "Import" brings them back, on this or another computer.
- A password-protected backup encrypts that file. Keep a regular backup: the projects live on this device.
- The Dashboard keeps the history in view: saved projects, the learning ratio, a price and mark-up advisor once enough quotes are closed, and rate-change alerts.
- And on the Enquiry tab, similar jobs you have done appear beside each new enquiry.
Remember: Save the project at each revision · Mark won, lost or delivered · Record the actual results · Keep a regular backup
Watch lesson 21
Special panels
The conventional way
- Relays, switches, gateway and 24 V supply listed by hand
- Node addresses kept in a separate sheet
- Network drawing made apart from the panel drawings
With PanelPro
- Every DOL and star-delta feeder gets its intelligent relay
- Switches, gateway, supply and addresses sized and priced
- Network sheet and node list drawn
- Works with every switchgear make
- Take an MCC estimate: pumps, compressors, drives and feeders are already in the load list.
- Change the panel type to "IMCC".
- Card 1b appears. Every DOL and star-delta feeder now gets an intelligent motor relay in place of the overload relay.
- The relay follows the switchgear make: here Siemens, so SIMOCODE pro. You can choose another.
- Choose the protocol: Modbus TCP, Profinet, EtherNet/IP, Modbus RTU or Profibus DP.
- A ring doubles the 24 V DC supply and adds a redundancy module.
- The card counts the nodes: motor relays, drives, large breakers and the incomer meter. It sizes the switches or bus segments, the gateway, the supply and the addresses.
- The schematics gain a network sheet, and a node list with every address.
- The typical control circuit is redrawn with the motor relay switching the contactor.
- The estimate prices the relay inside each feeder, and the network as its own group: switches, gateway, supplies, cables.
- The technical offer names the relay, the protocol and the network in its data sheet.
Remember: Panel type: IMCC · Relay by make, protocol, ring or single · Network sheet and node list · Relays and network in the price
Watch lesson 22
The conventional way
- kVAr worked out on a calculator
- Step sizes chosen by habit
- Reactor, capacitor voltage and incomer taken from separate tables
- Resonance with the transformer rarely checked
With PanelPro
- kVAr from the load and the power factors
- Steps proposed and written to the load list
- Capacitor, reactor, contactor or thyristor for each step
- Incomer at 1.5 times, resonance checked
- Start a new estimate and choose the panel type "APFCR".
- Give the kVAr directly, or let the app work it out from the load and the power factors.
- 750 kW, to be corrected from power factor 0.8 to 0.99.
- The app proposes the steps: 1 x 25 and 9 x 50 kVAr. One click writes them to the load list.
- Each step is built from its capacitor, a 7 % detuned reactor, the contactor and its protection. Behind the reactor the capacitor is rated 480 V.
- The incomer is taken at 1.5 times the capacitor current. Relay stages, the CT, the heat to remove and resonance with the transformer are all checked.
- Thyristor switching for fast loads, a plain bank without reactors, or 14 % reactors, are one choice away.
- The design sheet joins the single-line diagram and the typical capacitor step circuit.
- Capacitors, reactors and switching are priced from your own rates per kVAr.
- Those rates are in card 7: capacitor, capacitor contactor and fuse per stage, detuned reactor, thyristor switch and the APFC controller.
Remember: Panel type: APFCR · kVAr, or load and power factors · Create the steps · Check the incomer and resonance
Watch lesson 23
The conventional way
- Filter current taken from a quick guess
- CT position explained over the phone
- Modules, breakers and ventilation listed by hand
With PanelPro
- Filter current from the non-linear load and its distortion
- Made up of modules, each with its breaker
- Sensing CTs and their direction on the connection sheet
- Ventilation counted
- Choose the panel type "AHF".
- Give the non-linear load: here 600 A of drives.
- The kind of load sets a typical distortion: 40 % for 6-pulse drives with a line reactor. A measurement at site is better.
- The filter current is worked out for 5 % distortion at the supply, with a 20 % margin: 234 A, made up of 4 modules of 60 A.
- One click writes a breaker feeder for every module to the load list.
- The connection sheet shows where the sensing CTs go, and which way they face. This is the detail that is usually explained over the phone.
- Modules, CTs, breakers and ventilation are in the estimate.
- The filter itself is priced from your own rate per ampere, in card 7.
Remember: Panel type: AHF · Non-linear load and distortion · Create the filter feeders · CT position on the connection sheet
Watch lesson 24
The conventional way
- Route measured on the layout drawing
- Elbows, joints and hangers counted by hand
- Priced apart from the panel
With PanelPro
- Describe the route: up 3; right 12; down 2.5
- Elbows, joints and hangers counted
- Costed from your own rates
- Added to the estimate and the BOM
- Use the Bus duct tab when the job includes busbar trunking between a transformer, a panel and the loads.
- "Add bus duct run". Each run is one continuous duct, for example a riser.
- Choose the current rating, the conductor material and the IP.
- Describe the route in plain words, from the panel end: direction and metres, separated by semicolons.
- Every change of direction is an elbow and every junction between pieces is a joint. The app counts them.
- Add flanged ends, tee units, expansion units and tap-off boxes with their rating, as the job needs.
- The route is drawn in 3D so that you can check its shape. Drag to rotate, or pick isometric, front, side or top.
- Now your own rates. None are assumed: the rate per metre for this rating and material, and each fitting as so many metres of straight duct.
- Standard length, hanger spacing and the spacing of expansion units are settings too.
- The material total of the bus duct is shown, and added to the estimate before wiring, labour and mark-up.
- It appears in the estimate as its own group, so it is in the cost, the BOM and the offer.
Remember: Add a run and its rating · Type the route in metres · Enter your own rates · It joins the estimate
Watch lesson 25
The conventional way
- A different Excel template for every kind of panel
- ACB or MCCB decided feeder by feeder
- Bus couplers and synchronising sets added from memory
With PanelPro
- One load list for every kind of switchboard
- Large feeders take ACBs, small ones MCCBs or MCBs, by themselves
- Incomers, bus couplers and DG synchronising sets are counted
- The panel type prints on the offer and the drawings
- The panel type names the panel on the offer and on every drawing. Here it is a PCC, a power control centre.
- A PCC is a list of breaker feeders. Each one needs only a name, its rated amperes and the cable length.
- The amperes you type are the breaker rating, as on the single-line diagram: 1600 A gives a 1600 A breaker.
- Large feeders take air circuit breakers by themselves: here the 1600 A and the 800 A feeders.
- Smaller ones take MCCBs, at the breaking capacity set in card 1.
- A feeder given by its load in kW is different: its breaker is the first standard rating at or above the current times the breaker sizing factor.
- Two incomers and a bus coupler: set the number of incomer and coupler breakers to 3, in card 7.
- The incomer rating is worked out from the demand. Type a rating here to fix it, for instance to match the transformer.
- The busbar and the sections follow: incomer, busbar size and runs, number of sections.
- The single-line diagram shows the incomers, the coupler and the outgoing feeders.
- DG Sync Panel: a synchronising panel for diesel generator sets.
- Give the number of DG sets in card 7. A synchronising set is counted for each one, at your own rate per DG.
- The synchronising sets appear in the estimate as "Panel controllers".
- Metering Panel and Distribution Board are built from the same load list. For a board, use single-phase MCB feeders.
- Each single-phase circuit gets an MCB, and the circuits are spread across the three phases.
- The offer and the drawings are headed with the panel type you chose.
- MCC, intelligent MCC, APFC, harmonic filter, PLC, DCS and SCADA each have their own lesson.
Remember: Choose the panel type · Breaker feeders with their amperes · Set incomers, couplers and DG sets · Single-phase MCB feeders for boards
Watch lesson 26
Automation
The conventional way
- Controller and modules picked from the selection guide by hand
- Rack limits and power budget checked in a sheet
- Relays, fuses and terminals counted per I/O point
- Engineering hours guessed
With PanelPro
- Type the I/O count: controller, modules and racks are chosen
- 24 V DC supply, relays, fuses and terminals sized
- Architecture, module schedule and panel layout drawn
- Engineering hours counted, at your own rate
- Choose the panel type "PLC Panel". It needs no load list.
- If you have no I/O list yet, work it out from the equipment: so many motor starters, drives, valves, transmitters and switches.
- "Fill the I/O counts from this list" turns the equipment into digital and analog points.
- Or type the I/O count directly: digital and analog inputs and outputs, RTDs and thermocouples, with the spare percentage.
- Controller on automatic: the app chooses between Micro800, CompactLogix 5380 and ControlLogix 5580 from the size of the system. You can fix it.
- Redundancy, the I/O family, HART analog modules, 32-point digital modules and remote I/O panels are choices.
- Add the operator panel on the door, the drives on EtherNet/IP, other network devices and serial links.
- Panel choices: interposing relays on the outputs, how analog loops are fused and isolated, redundant 24 V DC supplies, a UPS.
- The design: controller, modules, the Ethernet switch, the 24 V DC supply sized from the load, relays, fuses and terminals, and the sections of the panel.
- Every rack is listed with its modules, and the rules are respected: modules per controller, modules per adapter, the length of the rail.
- Engineering is counted apart from material: software, FAT and documents in hours, at your own engineering rate, with site commissioning days.
- The Design tab draws the system architecture,
- the racks with their modules,
- the module schedule, slot by slot, with catalogue numbers,
- the power distribution with the 24 V DC supplies,
- and the panel layout, rail by rail.
- Every Allen-Bradley line carries its catalogue number as the part code. A price under that code in your item master is used automatically.
- Until then the prices are indicative, and the Dashboard counts the lines still waiting for your Rockwell price list.
Remember: Panel type: PLC Panel · I/O count, operator panel, network · Controller, racks and panel are designed · Import your Rockwell price list
Watch lesson 27
The conventional way
- Redundant chassis, HART modules and ring worked out from several manuals
- Servers and workstations counted from the guide
- Software licences listed from memory
With PanelPro
- Redundant process controllers, HART I/O on a device-level ring
- PlantPAx servers and workstations sized
- Two architecture sheets
- A reminder to confirm in Rockwell's PlantPAx System Estimator
- Choose the panel type "DCS Panel".
- Type the I/O count and the number of control loops.
- A DCS panel starts with redundant controllers, HART analog modules and a device-level ring. Each remains your choice.
- Two identical chassis carry the process controllers and the redundancy modules. A redundant chassis takes no local I/O, so all of it sits on EtherNet/IP adapters.
- The I/O banks are listed with their adapters, modules, 24 V DC supplies and the panel section each one needs.
- If servers and workstations are in your scope, give the operator and engineering stations, the historian, asset management, reports, monitors and desks.
- Below 2,000 I/O with up to ten stations the app takes a consolidated PlantPAx server. Larger systems get separate servers and a domain controller.
- The architecture sheet shows the redundant pair and every I/O bank on the ring.
- A second sheet lists the servers, the workstations and the software.
- The racks, the module schedule, the power distribution and the panel layout follow, as for a PLC panel.
- Controllers, I/O, software, servers and control-room equipment are separate groups in the estimate.
- The card reminds you to confirm the selection in Rockwell's PlantPAx System Estimator before you order.
Remember: Panel type: DCS Panel · I/O and control loops · Redundancy, HART, ring · Servers and workstations if in your scope
Watch lesson 28
The conventional way
- Licence sizes chosen from the price list by hand
- Computers, network and UPS remembered only at the order
- Engineering hours guessed
With PanelPro
- Tags, stations, redundancy and historian in; licences out
- Computers, network, UPS and furniture listed
- Engineering hours from displays and tags, at your rate
- Architecture sheet drawn
- Choose the panel type "SCADA System".
- Give the tags, the operator stations, whether the servers are redundant, and the historian.
- Then what surrounds it: report formats, third-party interfaces such as OPC UA, monitors, large screens, printers, the UPS and the operator desks.
- The app takes a redundant server pair with two clients, the display licence for the number of displays, the historian licence for the tags, the computers and the UPS.
- Engineering hours follow from the displays and the tags, and are priced at your own engineering rate.
- The architecture sheet shows the servers, the stations and the list of software and equipment.
- Software, computers and control-room equipment are separate groups in the estimate.
- The offer states the scope and the exclusions of a SCADA supply, not of a switchboard.
- For a PLC or a DCS with its SCADA in one offer, turn SCADA on inside the PLC or DCS panel instead.
Remember: Panel type: SCADA System · Tags, stations, redundancy, historian · Licences and computers are chosen · Engineering at your rate
Watch lesson 29
Biradar PanelPro 1.18. The application is an estimating and design aid. Check dimensions, wire lengths and hardware counts against your own shop standards and the maker's catalogue before you build.